Download Print this page

Miele DA 270 Operating And Installation Instructions page 28

Ventilation system

Advertisement

^ Hold the mounting plate up to the
ceiling so that the orange arrow faces
the front of the hood and aligns with
the line drawn on the ceilling.
Mark the position of the four mount-
ing bolts a for securing the mounting
plate and determining the position of
the hole the power cord b will pass
through.
Select the hole providing the shortest
route for the power cable b to reach
the power terminal located at the top
of the hood's chimney.
28
^ Feed the ductwork and power cord
through their respective holes in the
ceiling.
If 6" (150 mm) ductwork is not possible
then 5" (125 mm) ductwork can be
used in conjunction with a reducing
collar available from Technical Service
(see "Installation / Air extraction" for
further details).
^ Drill four
3
/
" (5 mm) holes in the
16
ceiling.
The S10 wall anchors included in the
packaging are not for use in
USA/CDN.
Be certain that the ceiling is stable
enough to support the hood.

Advertisement

loading