Download Print this page

Operating Components - Silvercrest SEKU 2000 A1 Operating Instructions Manual

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Operating components

Operating components
NOTICE
The operating elements are on the front of the appliance, above right and behind the ventilation grille.
To operate them, fold the ventilation grille forward.
ON/OFF switch (Flames)
ON/OFF switch (Heating, level 1)
2
ON/OFF switch (Heating, level 2)
3
Temperature control (Thermostat)
4
Dimmer (for fl ame lamps)
5
SEKU 2000 A1
4
3
2
5
GB
CY
7

Advertisement

loading