NEC 1160Xd Installation Procedures Manual page 12

Nec server installation procedures
Table of Contents

Advertisement

11. Four Styrofoam stoppers prevent the server from moving during shipment.
Wing nuts secure Styrofoam stoppers, located on both sides of the server as
well as the front and rear of the server, to the shipping pallet. Remove the
four wing nuts and remove the stoppers and set them aside. See Figure 6A.
12. A plastic sheathing, secured with tape, protects the bottom sides of the
server. Remove the tape and then cut and remove the bottom sheathing. Be
careful not to damage the upper vinyl shroud. Be sure the bottom sheathing
is free and clear of the server wheels and levelers. See Figure 6B.
13. Place the unloading ramp in front of the rear of the server and secure the
ramp to the pallet using the ramp plate removed in Step 10. See Figure 7.
8 Express5800/1160Xd/1320Xd Installation Procedures
B
A
A
Styrofoam Stoppers
B
Lower Plastic Sheathing
Figure 6. Removing the Cardboard Covers
Figure 7. Installing the Unloading Ramp

Advertisement

Table of Contents
loading

This manual is also suitable for:

1320xdExpress5800/1160xdExpress5800/1320xd

Table of Contents