Check List - Yamaha RIVAGE PM10 Systems Setup Manual

Digital mixing system
Hide thumbs Also See for RIVAGE PM10:
Table of Contents

Advertisement

Check list

You can use the following list to check whether the basic connections for the RIVAGE PM10 system are working properly.
Both power A and B for each device must be turned on.
Make sure that two power cords are connected to each device and that both power switches A and B on
each device are turned on.
Fiber optic cables for the TWINLANe network and CAT5e cables for the console network must be connected
between IN and OUT jacks respectively to form a ring topology.
Connecting IN jacks to IN jacks or OUT jacks to OUT jacks does not work. Make sure you connect the cables properly.
An HY card (HY256-TL) must be installed in HY card slot 1 on the
DSP engine and the I/O rack.
The HY card does not work in card slots 2-4. Install the card in
card slot 1.
The I/O rack must be connected to and recognized by the system
(SYSTEM CONFIG screen).
Press the I/O rack select button to set the rack correctly
(
page 36).
Channels must be assigned to the TWINLANe network correctly
(SYSTEM CONFIG screen).
Modify channel assignment so that the total number of channels
used on the TWINLANe network is 400 or less across all
components.
Refer to "Assigning channels to the TWINLANe network
(
page 36)" to make sure that your I/O rack settings are correct.
Refer to "Assigning channels to the TWINLANe network
(
page 36)" to make sure that your DSP engine settings are
correct.
The input ports must be patched correctly (Input Patch screen).
Refer to "Patching input ports (
how to patch input ports correctly.
The output patches must be set correctly (on the DSP engine setting
screen).
Refer to "Patching output ports (
on how to patch output ports correctly.
The word clock must be set correctly (WORD CLOCK screen).
Refer to "Setting the word clock (
on how to set the word clock correctly.
The status of TWINLANe network communication must be normal.
(The indicators of the HY256-TL.)
Make sure that the fiber optic cables are properly connected.
The synchronization must be finished (DEVICE SYNC screen).
Press the SYNC button to set the synchronization correctly
(
page 35).
OK
page 37)" for information on
page 38)" for information
page 35)" for information
RIVAGE PM10 System Setup Guide
41

Advertisement

Table of Contents
loading