Ups Anchorage - Toshiba 4400 Series Installation And Operation Manual

Table of Contents

Advertisement

8.3

UPS Anchorage

All 4400 Series models, except the 80 kVA, come with casters and leveling feet. The 80kVA model comes
with Angle Bracket skids.
The leveling feet allow the 15-50kVA models to be rolled into place, then the leveling feet extended to
remove weight from the casters to ensure the UPS remains stationary.
The skids on the 80kVA serve the same function. The 80kVA UPS can be bolted directly to the floor via the
Angle Bracket skids on the base.
Seismic Installations
For additional stability, an optional Seismic Kit is available for each cabinet model (P/N 440300SEISMICKIT
for the 15-30kVA, P/N 440500SEISMICKIT for the 50kVA, P/N 440800SEISMICKIT for the 80kVA). This
kit enables the UPS system to conform to the OSHPD seismic certification requirements. See the 4400
Seismic Kit Installation Instructions, P/N 94016, for details.
Anchorage Bolts for 80kVA Cabinets
Install the anchor bolts to secure the UPS on the floor. See Figure 8.3 for anchor bolt installation detail.
Use 5/8" (16 mm) diameter anchor bolts. There are 0.7" (17.9 mm) diameter holes provided in the UPS
base. See Figure 8.3 and 8.6 for the hole locations and dimensions.
26
80kVA
Skids
Anchor Bolt
4 x 5/8 in (16 mm) diam-
eter bolt holes
FIGURE 8.3 ANCHOR BOLT INSTALLATION DETAIL
4400 Series Installation and Operation Manual – 64527-006
4 bolt holes
(Side View)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents