Configuration And Operation; Notes On Operation; Configuration In Step 7 - Siemens S7-1200 Operating Instructions Manual

Hubs & controllers telecontrol/lte
Hide thumbs Also See for S7-1200:
Table of Contents

Advertisement

Configuration and operation

4.1

Notes on operation

Minimum clearance to the device
The device may only be operated when the distance between the device (or antenna) and
user is at least 20 cm.
NOTICE
Closing the front panels
To ensure interference-free operation, keep the front panels of the module closed during
operation.
4.2

Configuration in STEP 7

Configuration in STEP 7
You configure the modules, networks and connections in an engineering station in SIMATIC
STEP 7. You will find the required version in the section Requirements for operation
(Page 19).
You can configure a maximum of three CMs/CPs per station. If you insert several CPs in an
S7-1200, you can, for example, establish redundant communications paths.
Configuring communication with the CPU (data point configuration)
CP communication is not programmed using program blocks but configured using data
points.
One requirement for data point configuration is the programming of the assigned CPU and
the input and output data of the station. To assign the user data to be transferred
(input/output data) to the data points, you need to create PLC tags.
CP 1243-7 LTE
Operating Instructions, 01/2015, C79000-G8976-C381-01
CAUTION
4
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp 1243-7

Table of Contents