Sharp vc-ga56z Service Manual page 24

Video cassette recorder
Table of Contents

Advertisement

VC-GA56Z
VC-GH96Z
4-21. REPLACING THE UPPER AND LOWER
DRUM ASSEMBLY
• Replacement (Perform in the numerical order)
1 Remove the motor as stated in 4-20 D.D. motor re-
placement.
2 Remove the drum earth brush ass'y 2.
3 Remove the drum base 3 from the upper and lower
drum assembly 1.
[Cares when replacing the drum]
1. Be careful so that the drum earth brush is not lost.
2. Do not touch directly the drum surface.
3. Fit gently the screwdriver to the screws.
4. Since the drum assembly is an extremely precise
assembly, it must be handled with utmost care.
5. Make sure that the drum surface is free from dust, dirt
and foreign substances.
6. After replacing the drum be sure to perform the tape
running adjustment.
After that, perform also the electrical adjustment.
• Playback switching point adjustment
• X-position adjustment and check
• Standard and x-3 slow tracking adjustment
7. After replacing the drum clean the drum.
2
1
Figure 4-39.
4-22. ASSEMBLING OF PHASE MATCHING
• Assemble the phase matching mechanism compo-
1. Assemble the pinch roller assembly and pinch drive
2. Mounting the shifter (on the back of the mechanism
3. Mounting the master cam (on the back of the mecha-
4. Assemble the connection gear, slow brake and loading
• Pinch drive cam and pinch roller assembling
(Place the following parts in position in numerical order.)
(1)Reverse drive lever 1
(2)Reverse guide spring 2
(3)Reverse guide lever ass'y 3
(4)Reverse guide height adjusting nut 4
(5)Pinch drive cam 5
(6)Pinch roller ass'y 6
(7)Open lever 7
3
24
MECHANISM COMPONENTS
nents in the following order.
cam.
chassis).
nism chassis).
motor parts.
method.
Figure 4-40.
7
6
4
3
1
2
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vc-gh96z

Table of Contents