HCD-F200/F500
3-19. LEVER (LOADING-L/R)
SPT-T (loading-R)
SPR-T (loading-L)
lever (loading-R)
two hooks
two hooks
lever (loading-L)
PRECAUTION DURING LEVER (LOADING R/L) INSTALLATION
BOTTOM VIEW
Align the horizontal position.
lever (loading-L)
lever (loading-R)
Install the both levers so that they move symmetrically.
21