4.2:
"System shutdown" window
The connections to the PV system, the batteries
and the external switches are interrupted.
The inverter and the battery converter are shut
down.
2. Turn the On/Off switch of the DC isolator to Off
The connections between the solar generator and
the storage system are interrupted.
3. Behind the housing door: Turn the On/Off switch
to Off
4.3:
System On/Off switch
4. Wait 13 minutes until the device is fully de-
energised.
The storage system is switched off.