Switch Sw3/Sw4 Configuration - GE Multilin D400 Instruction Manual

Substation gateway
Hide thumbs Also See for Multilin D400:
Table of Contents

Advertisement

CHAPTER 3: SETTING UP COMMUNICATION CARDS

Switch SW3/SW4 configuration

Function
Pin 6 Signal
DTE (default)
DSR Input
DCE
DTR Output
IRIG-B Enable
Ground
D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
Switches SW3 (for Port 2) and SW4 (for Port 1) control the signals on Pins 4 and 6 of the RS-
232 port. Each switch contains four switch positions that can each be set to ON or OFF to
select the appropriate function for the port option.
Table 8: RS-232 Card Switch SW3/SW4 Settings
SW3/SW4 Positions
1
2
OFF
OFF
ON
OFF
ON
OFF
OFF
OFF
OFF
The switch positions are listed for:
DTE (Pin 4 DTR Output to DCE and Pin 6 DSR Input from DCE). See Figure 12.
DCE (Pin 4 DTR Input from DTE and Pin 6 DSR Output to DTE). See Figure 13.
IRIG-B Enable (on Pin 4) and Ground (on Pin 6). See Figure 14.
Figure 12: Switch SW3/SW4 configuration for port DTE (default)
O N
1
2
3
Figure 13: Switch SW3/SW4 configuration for port DCE
ON
1
2
3
Figure 14: Switch SW3/SW4 configuration for port IRIG-B)
ON
1
2
3
Pin 4 Signal
3
4
OFF
DTR Output
OFF
DSR Input
ON
IRIG-B Output
4
5
6
7
4
5
6
7
4
5
6
7
GE INFORMATION
SW3/SW4 Positions
5
6
7
OFF
ON
OFF
OFF
OFF
ON
ON
OFF
OFF
8
8
8
8
OFF
OFF
OFF
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents