GE AKTA avant Operating Instructions Manual page 110

Preparative chromatography system
Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

5 Prepare the system for a run
5.2 Prepare the flowpath
Prepare the waste tubing
Make sure that the waste tubing is prepared according to the instructions in
Prepare waste tubing, on page
Prepare the outlet tubing
Connect outlet tubing to the outlet ports of the outlet valve that are to be used during
the run. If a fraction collector is to be used, make sure that tubing is connected between
the outlet valve Frac port and the fraction collector, and prepare the fraction collector.
Otherwise, immerse the outlet tubing in suitable tubes or flasks.
Plug unused valve ports
It is recommended to plug all unused valve ports with stop plugs before starting a run.
See ÄKTA avant User Manual for information about connectors.
110
73.
ÄKTA avant Operating Instructions 29101556 AB
Section 4.2.3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents