Mitsubishi Electric MELSEC iQ-R Series Programming Manual page 150

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Online change (inactive SFC block)
RnPCPU
RnCPU RnENCPU
(Process)
An inactive SFC block can be changed in units of blocks. Since an SFC program can be changed online in units of blocks as
long as the target block is inactive, efficiency of debugging and maintenance of SFC programs will be improved.
Before change
Block 0
Block 100
Block 200
Block 319
Inactive block or step
Active block or step
(1) An inactive block in an SFC program can be changed.
(2) SFC blocks other than the one changed maintain their active states.
Before using the online change (inactive SFC block), check the versions of the CPU module and the
engineering tool used.
For the versions of the CPU module and the engineering tool, refer to the following.
 MELSEC iQ-R CPU Module User's Manual (Application)
8 SFC PROGRAM
148
8.7 SFC Program Execution
RnPCPU
RnSFCPU RnSFCPU
(Redundant)
(Standard)
(Safety)
Initial
N
Action 0
Transition 0
Step 0
N
Action 1
Transition 1
End step
Initial
N
Action 0
Transition 0
Step 0
N
Action 1
Transition 1
End step
After change
(1)
Block 0
Block 100
Block 200
Block 319
(2)
Initial
N
Action 0
Transition 0
N
Action 1
Step 0
Transition 1
Added
N
Action 2
Step 1
Transition 2
End step
Initial
N
Action 0
Transition 0
Step 0
N
Action 1
Transition 1
End step

Advertisement

Table of Contents
loading

Table of Contents