Hitachi CL 10D2 Technical Data And Service Manual page 28

Cordless stud cutter
Table of Contents

Advertisement

(f) Mounting the assembly to the main body
(i) Insert the Ball Bearing 608VVC2PS2L [23] in the ball bearing chamber of Housing (A) [2] (Fig. 40).
(ii) Press-fit the Third Pinion [21] in the Second Gear [22] and insert it in the Ball Bearing 608VVC2PS2L [23] of
Housing (A) [2] (Fig. 40). At this time, apply grease (Nippeco SEP-3A) to the outer circumference of the
Second Gear [22].
(iii) Mount the Gear Cover [19] to the housing keeping Bracket (A) [42] at the maximum cutting position in the
same manner as the removal procedure (be careful of the spring force) (Fig. 41).
(iv) Tighten the four Tapping Screws (W/Flange) D5 x 25 (Black) [17] and the two Tapping Screws D5 x 35 [43]
(Fig. 41).
CAUTION: Check that there is no scratch, dust or chips on the surfaces of the cam and the roller.
(g) Reassembly of the Return Plate [41]
Align the Return Plate [41] with the Roller Pin [54] and Bolt (A) [39]. Insert the pin of the Cam Shaft [55] in
the hole of the Return Plate [41] and secure them with the two Seal Lock Screws (W/SP. Washer) M4 x 12
[40] (Fig. 41).
[21]
[22]
[23]
Fig. 40
--- 25 ---
[17]
[40]
[43]
[41]
Fig. 41
Maximum
cutting
position

Advertisement

Table of Contents
loading

Table of Contents