1.2.3 Maintenance and Inspection

5 minutes

1.2.4 Product End of Life

2. Product Overview

The following section describes product appearance, packaging, accessories, technical parameters and other relevant
information concerning the AEG grid-tied three-phase solar inverters of the AS-IC01 and AS-IC01-2 series.
PD201709 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.1-17 EN
Only qualified electricians are allowed carry out inverter maintenance, inspection and component re-
placement.
If the product requires maintenance, contact your supplier.
Before attempting any maintenance, disconnect first all power supplies of the grid to the inverter.
Thereafter, disconnect the breakers; wait for at least 5 minutes until the inverter is discharged before
attempting maintenance.
Please follow electrostatic protection norms and take correct protective measures because
circuits and components in the inverter are sensitive to electrostatic electricity.
Do not use non-original parts and components during maintenance.
After solving faults / problems that may affect the safety and performance of the inverter, restart the
inverter.
Do not get close to or touch any metal conductive part of the grid or inverter, otherwise electric shock,
physical injury or death and fire may occur. Always pay attention to warning icons and instructions
signaling the possibility of an electric shock.
Please abide wit
h local regulations for the inverter disposal.
The inverter and its components should be dealt with as industrial waste.