Continuous gas analyzers integrated analyzer system measurement made easy (362 pages)
Summary of Contents for ABB AZ200 737
Page 1
Instruction IN/ANAINST/032-EN Rev. B Endura AZ20 series probe Combustion oxygen monitor Installing large surface area filter Kit reference: AZ200 737 Measurement made easy 1 Introduction 2 Tools / Items required This publication details fitting of a large surface area filter —...
ABB is committed to ensuring that the risk of any local regulations. environmental damage or pollution caused by any of its —...
Page 3
4 Isolating the transmitter and shutting down sensor air / gas supplies 4.1 Isolating the transmitter Referring to transmitter Instruction manual IM/AZ20E-EN. 1. Isolate transmitter from incoming mains powers supplies. DANGER – Serious damage to health / risk to life Do not proceed until the transmitter is isolated from mains power supplies.
Page 4
5 Removing the diffuser flame arrestor 5. If the cell is welded to the helical contact at the end of the thermocouple / electrode assembly, carefully withdraw the and cell cell and thermocouple / electrode contact assembly until the cell tip G is visible. WARNING –...
Page 5
Fig. 5.1 Removing the diffuser flame arrestor and cell Endura AZ20 series probe | Combustion oxygen monitor | IN/ANAINST/032–EN Rev. B...
Page 6
10. Locate filter gaskets N, ceramic filter O and clamp plate 6 Refitting the cell and large surface area filter IMPORTANT NOTE Referring to Fig. 6.1, page 7: Fit the same number of gaskets each side of ceramic 1. Check the cell mounting area for damage and ensure it is filter O.
Page 7
Fig. 6.1 Refitting the cell and fitting the large surface area filter Endura AZ20 series probe | Combustion oxygen monitor | IN/ANAINST/032–EN Rev. B...
Page 8
Howard Road, St. Neots notice. With regard to purchase orders, the agreed Cambridgeshire, PE19 8EU particulars shall prevail. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this document. Tel:...