SmartAX MA5800-X2
Quick Installation Guide
Issue: 01
Date: 2016-10-28
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SmartAX MA5800-X2

  • Page 1 SmartAX MA5800-X2 Quick Installation Guide Issue: 01 Date: 2016-10-28 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 About This Document Intended Audience This document describes how to install the MA5800-X2. The intended audience is hardware installation engineers. Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol Description Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury.
  • Page 3: Table Of Contents

    Content 1 Precautions …………………………………..…………………………......………….1 2 Tools and Meters………………………….…………………………......…………….2 3 Appearance and Structure………………………………......…………….3 4 Environment Requirements on Third-Party Cabinets ………………………......4 5 Space Requirements on Third-Party Cabinets …………….…………......4 5.1 When the Cabinet Accommodates One MA5800-X2 Subrack........4 5.2 When the Cabinet Accommodates Two Subracks………………………….…………...5 6 Installing the Installing the Service Subrack..…............………...7 6.1 Installation in the Cabinet or Rack ………………….............7 6.2 Installation in the Network Cabinet of the Customer ............8...
  • Page 4: Precautions

    • After the identification plate for the power cable is attached to the power cable, the text area of the plate must face rightwards or upwards. Ensure that the side attached with the label faces outwards. Copyright © Huawei Technologies Co., Ltd. 2016 All rights reserved.
  • Page 5: Tools And Meters

    2 Tools and Meters Before you begin, get the following tools ready. Marker Flat-head screwdriver Phillips screwdriver Diagonal pliers Network cable Network cable tester Multimeter Optical power meter crimping tool ESD gloves ESD wrist strap Cable cutter Paper knife Adjustable wrench Mounting bar Measuring tape Cable cutter...
  • Page 6: Appearance And Structure

    3 Appearance and Structure Control board Power board Fan tray Mounting Mounting bracket bracket ETSI ETSI Mounting Mounting bracket bracket Cabling teeth Service board Grounding ESD jack point Service Subrack (with IEC mounting bracket) Unit: mm 88.1 268.7 442.0 482.6 Service Subrack (with ETSI mounting bracket) Unit: mm 88.1...
  • Page 7: Environment Requirements On Third-Party Cabinets

    Huawei for the MA5800-X2. • Cabinet door requirement: When devices are operating, keep the cabinet door closed. • Grounding requirement: Huawei cabinets are grounded through mounting bars. Ensure that third-party cabinets are properly grounded based on site conditions. • Power distribution requirements: Ensure that an over-current protection mechanism has been deployed on the upper-level device.
  • Page 8: Space Requirements On Third-Party Cabinets

    5 Space Requirements on Third-Party Cabinets 5.1 When the Cabinet Accommodates One MA5800-X2 Subrack • The MA5800-X2 supports left-in right-out heat dissipation, so the cabinet must have an unblocked air inlet on its door. • You are advised to reserve more than 4 U space above and under the MA5800-X2 respectively to minimize the impact on other components in the cabinet.
  • Page 9: When The Cabinet Accommodates Two Subracks

    5 Space Requirements on Third-Party Cabinets 5.2 When the Cabinet Accommodates Two Subracks • Reserve 10 U space between the devices or add a 3 U air deflector to redirect air flows to minimize the mutual heat dissipation impacts on the devices. •...
  • Page 10: Installation In The Cabinet Or Rack

    6 Installing the Service Subrack 6.1 Installation in a Cabinet or a Rack • Use the IEC mounting bracket when the service subrack is installed in the IEC cabinet or rack. • Install the mounting ears of the IEC subrack, and then install the mounting ears of the ETSI subrack on the mounting ears of the IEC subrack.
  • Page 11: Installation In The Network Cabinet Of The Customer

    6 Installing the Service Subrack 6.2 Installation in the Network Cabinet of the Customer • For better heat dissipation, when installing the MA5800-X2 in the network cabinet, avoid the short circuit of airflow inside the MA5800-X2 and maximize the vent area. •...
  • Page 12: Guide For Grounding The Network Cabinet Of The Customer

    6 Installing the Service Subrack 6.3 Guide for Grounding the Network Cabinet of the Customer TN-S power distribution system TN-C-S power distribution system MA5800-X2 Ground bar PGND AC lightning protection bar PGND AC power distribution cabinet TN-S power distribution system •...
  • Page 13: Routing Cables

    7 Routing Cables 7.1 Routing the PGND Cable and the External Power Cable • Connect the PGND cable properly to ensure that the service subrack is protected from the lightning and other interferences. • Before routing the power cable, turn off the output switch of the DC power system. configuration To DC PDU DC power cable...
  • Page 14: Routing Network Cables

    7 Routing Cables 7.2 Routing Network Cables • Network cable and power cable need to maintain a certain distance. To maintenance terminal or transmission unit Network cable Network cable...
  • Page 15: Routing Optical Fibers

    7 Routing Cables 7.3 Routing Optical Fibers • When handling optical fibers, do not stand close to or look into the optical fiber port directly with naked eyes. • The bending radius of the optical fiber should be more than 20 times the cable diameter. In general, the bending radius of the optical fiber is greater than or equal to 40 mm.
  • Page 16: Checking The Installation

    8 Checking the Installation Description Method Do not place any materials on the service subrack. Observe All the cables are bound with proper tightness. The space between Observe the cable ties is even, and the remaining parts of the cable ties are cut off neatly.
  • Page 17: Powering On The System

    9 Powering On the System • Power on the device only when the input voltage is in the normal range. • Use the multimeter to test the voltage between NEG(-) and RTN(+) on the DC PDU for the MA5800-X2 powered by the -48 VDC. The voltage should range from -38.4 V to -57.6 V. •...