Connecting The Drain Pipe - Pioneer CYB Series Installation Manual

Ductless mini split system air conditioner/heat pump (cooling-only version, cooling and heating version) 9,000-18,000 btu/hr
Hide thumbs Also See for CYB Series:
Table of Contents

Advertisement

2) Be sure to insulate both the gas and liquid piping. Use
separate thermal insulation pipes for gas and liquid
refrigerant pipes. See the figure below.
Inter-unit wi
Gas pipe
Gas pipe
insulation
Finishing tape
3) Finally, insulate as shown in the figure below.
6
5
3
1
2
4
_
Piping insulation procedure
6
3
2
6
4
B
A
1
Piping insulation material(field supply)
2
3
Fla「e nut connection
4
Insulation for fitting (field supply)
5
Piping insulation material (main unit)
6
Indoor un仆
Clam p (fiel d sup ply)
A
Turn seams up
B
C
Attach to base
Tighten the part other than the piping insulation mate
A
For local insulation, be sure to insulate local piping
all the way into the pipe connections inside the unit.
Exposed piping may cause condensation, or may
cause burns when touched.
Make sure that no oil remains on plastic parts of the
decoration panel (optional equipment).
Oil may cause degradation and damage to plastic
parts.
e
Liqu id pipe
Liqu id pipe
insulation
Drain hose
1
Liqu id pipe
2
3
Gas pipe
4
Insulation for liquid pipe fitting
5
Insulation for gas pipe fitting
Clamps
(use 2 clamps per insulation)
6
Indoor unit
_
5
2
4
6
6 3
A
ial
4
CONNECT THE DRAIN PIPE
4.1 Installation of Drain Piping
Install the drain piping as shown in figure below, and take measures
against condensation. Improperly「igged piping could lead to leaks,
and eventually wet furniture and belongings.
X
1
Hanging bar
2
1/100 gradient
4.2
Install the drain pipes.
Keep piping as short as possible, and slope it downwards at
a gradient of at least 1/100 so that air may not remain
trapped inside the pipe.
Keep pipe size equal to or greater than that of the connecting
pipe (PVC pipe, nominal diameter 20mm/0.8in in, outside
diameter 25mm/1in).
- Push the drain hose as far as possible over the drain socket,
and tighten the metal clamp securely.
5
3
2
1
D
ain socket (attached to the unit)
2
3
metal clamp
4
Drain hose
Insulation (field supply)
- Insulate the drain hose inside the building.
- If the drain hose cannot be sufficiently set on a slope, fit the
hose with d
ain raising piping (field supply).
- Make sure that heat insulation work is executed on the
following 2 spots to prevent any possible water leakage due
to dew condensation.
1 Indoor drain pipe.
2 Drain socket.
12
1-1.Sm
1
3-51!
2
3
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cab series

Table of Contents