Renewal Parts - GE SBM Instructions Manual

Control and transfer switch
Table of Contents

Advertisement

Each cam has one number and seven letters
around the shaft opening on one side of the cam and
eight letters on the other side of the cam. When
removing cams, mark the letter of the cam which
corresponds to the shaft identification mark;
cam and cam followers are removed in succession.
This is done to each succeeding-barrier.
When reassembling, it is only necessary to
stack the cams back into the shaft in the same order
as taken off, keeping the proper cam letter lined
up with the shaft identification mark.
�·�.··
Before tightening the tie bolts into the front
support, make sure that all the barriers are properly
nested.
Control and Transfer Switch Type SBM
The parts which fit into the front support may
now be assembled, placing the stops, if present, in
their
proper
position

RENEWAL PARTS

identification mark.
thus
It
is recommended that sufficient quantities of
renewal parts be carried in stock to enable the
prompt replacement of any that are worn, broken
or damaged.
When
ordering
nearest Sales Office
pany, specify quantity required, name of part wanted,
and give complete nameplate data.
GEH-2038
to
with respect
the shaft
renewal
parts,
address
of
the General Electric Com­
the
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents