Display And Operation Panel - AEG AS-IC01 Installation Instructions Manual

Three-phase grid-tied solar inverter 4 kw to 10 kw
Table of Contents

Advertisement

30
9. Install the screws and coversof cooling bin or fan box to their original position;
10. Install the inverter to its original position again according to section 3.
11. Repeat the operation in section 4.1
12. Restart the inverter.

5. Display and operation panel

This section describes the panel display and provides instructions for display operation, including the LED indicators and
the LCD display. The LED indicators and the LCD display show the operation states and parameters. The displayed
content and parameters can also be set or modified by the operational panel.
LCD screen
PD201809 AEG GRID-TIED THREE-PHASE SOLAR INVERTER (4-10 kW) V.2-18 EN
Do not start the inverter immediately it if alarms and stops. Figure out the cause
And confirm all the faults are removed before starting the inverter again. Inspections
Should be carried out in strict accordance with the procedures in section 4.1
Figure 16A: Operation Panel
LED indicators
Operational panel
30

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-ic01-2

Table of Contents