Page 2
We are an established world force in the design and manufacture of measurement products for industrial process control, flow measurement, gas and liquid analysis and environmental applications. As a part of ABB, a world leader in process automation technology, we offer customers application expertise, service and support worldwide.
Do not equipment and follow the instructions given. Failure to do use Torbar for any other application without consulting ABB this could result in damage to equipment and create Limited or an accredited agent.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2 Initial Installation 2.1 General The differential pressure generated by the Torbar exits at the high- and low-pressure connections on the head of the device. Flow The connections are identified by the letters L (low pressure) and H (high pressure).
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.2 Mounting 2.2.1 General Select a location with sufficient clearance to install and remove Torbar. Referring to Fig. 2.1, install Torbar: at right angles to the pipe run across the pipe diameter ...
Torbar. Extend the lagging to (but do piping configurations, consult ABB. not lag) the filling tees, condensate pots (if fitted) and isolation valve handles.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.4 Threaded Models FPD350.T3 and FPD350.T4.E1 2.5 Threaded Models FPD350.T4.E2 Note. For models with a Duct-Mounting Plate, refer to Note. For models with a Duct-Mounting Plate, refer to Section 2.6, page 8.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 11. Referring to Fig. 2.8, screw support plug into threaded 2.6 Threaded Models FPD350.T3.E1 and FPD350.T4.E1 with Thin Wall Duct Mounting Plates fitting and tighten, ensuring that: (Option DF1) a. support plug...
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.10 Flanged Models FPD350.(T4/T5).E2 with Flanged 2.11 Models FPD350.(L6/L7).E1 End-Support Fitting (mounting types F3 and F4) Install the Torbar as follows: Warning. Models FPD350.(L6/L7).E1 are designed for 'Hot-Tap' installation. Observe relevant safety 1.
Page 14
FPD350 Torbar Averaging pitot tubes 2 Initial Installation k. Insert the Torbar through isolation valve until it touches the opposite internal wall of the process pipe. Warning. During step l, maintain continuous pressure on the Torbar to ensure that it remains in contact with the opposite internal wall of the process pipe.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.12 Threaded Model FPD350.L7.E2 Warning. Threaded model FPD350.L7.E2 is supported in the process pipe at the Torbar tip as well as at the entry point into the pipe, therefore it cannot be 'Hot-Tap' installed.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.13 Threaded Models FPD350.L6.E1 and FPD350.L7.E1 f. Ensure the drawbolt (or optional geared) retraction Warning. Threaded models FPD350.L6.E1 assembly is in the fully retracted position. FPD350.L7.E1 are designed for 'Hot-Tap' installation. g. Fit pressure chamber...
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.14 Threaded Model FPD350.H7.E2 g. Tighten the packing gland bolts equally and Warning. Threaded model FPD350.H7.E2 is supported in evenly until the packing gland is fully sealed, the process pipe at the Torbar tip as well as at the entry ensuring the Torbar is able to slide through it.
Page 19
FPD350 Torbar Averaging pitot tubes 2 Initial Installation Fully Inserted Fully Retracted Flow Max. 60 mm (2.4 in) Fig. 2.13 Installation of Threaded Model FPD350.H7.E2 OI/FPD350–EN Rev. H...
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.15 Flanged Models FPD350.(H6/H7/H8).E1 k. Carefully open isolation valve and check for Warning. Flanged models FPD350.(H6/H7/H8).E1 are leaks around packing gland designed for 'Hot-Tap' installation. Observe all relevant safety precautions for drilling into pressurized pipelines, and Note.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.16 Flanged Models FPD350.(H7/H8).E2 Warning. Flanged models FPD350.(H7/H8).E2 Note. During step l, turn drive nuts equally and supported in the process pipe at the Torbar tip as well as at evenly to prevent binding.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.17 Flanged Models FPD350.(H7/H8).E2 with Flanged End-Support Fitting (mounting types F3, F4) Warning. Flanged models FPD350.(H7/H8).E2 Note. The gear retraction handle is supplied loose supported in the process pipe at the Torbar tip as well as at and can be fitted to either side of the gears.
FPD350 Torbar Averaging pitot tubes 2 Initial Installation 2.18 Flanged Pipe Fitting (Stand-Off) Installation g. Make reinforcing welds at the crotch bevelled areas Note. This Section is applicable only to flanged Torbar of the flanged pipe fitting (stand-off) to provide models.
FPD350 Torbar Averaging pitot tubes 3 Torbar Removing and Refitting 3.3 Models FPD350.(L6/L7) Warning. Do not position any part of the body in the Torbar's exit path when removing or refitting the Torbar. 3.3.1 Removing Referring to Fig. 3.1: 1. Reposition chain link...
FPD350 Torbar Averaging pitot tubes 3 Torbar Removing and Refitting 3.4 Threaded Models FPD350.(H6/H7) Warning. Do not position any part of the body in the Note. The gear retraction handle is supplied loose and Torbar's exit path when removing or refitting the Torbar.
FPD350 Torbar Averaging pitot tubes 3 Torbar Removing and Refitting 3.5 Flanged models FPD350.(H6/H7/H8) Warning. Do not position any part of the body in the Note. The gear retraction handle is supplied loose and Torbar's exit path when removing or refitting the Torbar.
FPD350 Torbar Averaging pitot tubes 4 Connecting a Differential Pressure Measuring Instrument 4 Connecting a Differential Pressure Measuring Instrument 4.1 General 4.3 Purging Before connecting a differential pressure measuring instrument, Torbars can be used successfully for measuring the flow of dirty read the manufacturers’s installation instructions.
Page 32
FPD350 Torbar Averaging pitot tubes 4 Connecting a Differential Pressure Measuring Instrument Lagging DP Isolating Valves Process Pipe Flow Torbar Head Minimum Slope 25 mm per 300 mm Impulse Tubing (1 in. per 12 in.) (Not Lagged) 3 or 5 Valve Manifold DP Transmitter Fig.
FPD350 Torbar Averaging pitot tubes 5 Maintenance 5 Maintenance Torbar Averaging Pitot Tube elements have no moving parts, and do not normally require routine maintenance. However, depending on process conditions, check Torbar periodically for signs of blockage, erosion or corrosion. If withdrawal is necessary, it must be carried out in accordance with the relevant procedure –...
FPD350 Torbar Averaging pitot tubes 6 Troubleshooting 6 Troubleshooting If a malfunction is suspected: 1. Check for leakage between the head of the Torbar and the transmitter or indicator. Note. Compared to orifice plates and other primary flow elements, Averaging Pitot Tubes create small differential pressures.
Page 35
— Food & Beverage offices for details on your nearest Service and Repair Centre. — Manufacturing — Metals and Minerals — Oil, Gas & Petrochemical ABB Limited — Pulp and Paper Tel: +44 (0)1453 826661 Drives and Motors Fax: +44 (0)1453 829671 —...
Page 36
Oldends Lane notice. With regard to purchase orders, the agreed Stonehouse particulars shall prevail. ABB does not accept any Gloucestershire GL10 3TA responsibility whatsoever for potential errors or possible lack of information in this document.