Download Print this page

Sealey TC10A Instructions page 4

Tyre changer - assist arm for tc10

Advertisement

Standard Inflation
5.3.
5.3.1.
Check the air supply to see if the air connection is OK.
5.3.2.
The machine is equipped with an inflation gauge for monitoring the inflation of the
tyre and the inflation pressure.
5.3.3.
remove turntable clamps from the tyre.
5.3.4.
Connect the inflation hose with the tyre air valve.
5.3.5.
In the process of inflation, check the pressure indicated on the pressure gauge does
not exceed the scope specified by the manufacturer. The machine is equipped with
a pressure regulating valve to prevent the pressure exceeding 3.5 bar. This can be
adjusted dependent on requirements.
5.3.6.
If the inflation pressure is too high, press the deflation button on the inflation device
to reach the required air pressure.
environment protection
recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
note: it is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
important: no liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
sealey group, Kempson Way, suffolk business park, bury st edmunds, suffolk. ip32 7ar
01284 757500
© Jack sealey limited
01284 703534
sales@sealey.co.uk
Original Language Version
www.sealey.co.uk
tC10A | Issue 1 06/02/18

Advertisement

loading