Installation Flow; Checking The Contents In The Package - NEC BBU User Manual

Battery backup unitfor 8480e and 8408e dacs
Table of Contents

Advertisement

3. Installation Flow

The following shows the BBU installation flow. For more information, refer to the corresponding chapters.

4. Checking the Contents in the Package

The package contains the following items. Check the contents to confirm you have all the necessary items
before starting the installation job.
No.
Item
1
Additional DAC battery
2
User Guide
3
Setup date label
The package contains the following items.
Battery Backup Unit (BBU)
Setup Date label
Start
Check BBU and accessories.
Check notes.
Install BBU.
Check and set connections.
End
Chapter 1
Describes how to check the BBU and
the included accessories as well as
installation notes.
Chapter 2
1. Installation Procedure
Describes how to install the BBU.
Chapter 2
2. Utility Check
Describes the connection checking
procedure after the battery installation
and the setting of the write cache
mode.
Qty
Remarks
1
This unit
1
This manual
1
13

Advertisement

Table of Contents
loading

Table of Contents