Download Print this page

GE UltraMax Installation Manual page 3

Connected led driver

Advertisement

6. Install the new driver and make sure the new driver is properly grounded to metal fixture per
National Electrical Code (NEC). Tighten driver mounting screws seating driver firmly against
fixture surface. To insure electrical grounding between driver case and fixture housing
mounting screws with star washers are recommended to break (penetrate) the painted surface
of the driver mounting foot.
7. Install the antenna within the fixture enclosure (away from grounded metal surfaces when
possible). The antenna shall not be cut or have any insulation material removed or tampered
with in any way.
8. Use only U.L. approved wire connectors for all electrical connections. CAUTION: Wire
connectors must be securely fastened and must completely cover exposed wire ends to prevent
shock hazard.
9. Be sure to insulate unused leads INDIVIDUALLY to 600Vrms using U.L. approved wire
connectors.
10. Verify that all installation and safety requirements have been completed and reinstall driver cover.
After driver installation:
11. Restore power at circuit breaker, apply power to the fixture and ensure fixture is operational.

Advertisement

loading