Mounting / Installation; Assembly - Siemens FDCL221 Technical Manual

Line separator
Hide thumbs Also See for FDCL221:
Table of Contents

Advertisement

Mounting / Installation

5
Mounting / Installation
5.1

Assembly

1 Pair of terminal blocks
20
Building Technologies
Fire Safety & Security Products
The line separator may be fitted in any position. Ensure that the line separator LED
is visible after installation.
You can fit the FDCL221 line separator in various ways:
Using a top hat rail TS35
Using the fastening hole
Installation on top hat rail TS35
Line separator installation on a top hat rail
Attach the line separator to the top hat rail.
If you are fitting several line separators onto the top hat rail at the same time, we
would recommend using a pair of terminal blocks (at least 3 sets) after each line
separator. This results in a clear and space-saving form of installation.
The terminal blocks must be ordered by the party responsible for installation.
1
007063_e_en_--
09.06.2009

Advertisement

Table of Contents
loading

Table of Contents