Download Print this page

LG 32SE3B-BE Service Manual page 66

Monitor signage

Advertisement

Standard Repair Process Detail Technical Manual
symptom
Signage Monitor
Content
Copyright ⓒ 2015 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Error
B. Power error _No power
Check power input voltage and ST-BY 3.5V
11
Check the Main Power Voltage (4,5,6 Pin)
Power On (DC On) Status : 13.2 V
STBY Status : 8.8 V
12 Pin
(Power Board ↔ Main Board)
SMAW200-H12S5K(BK)
1
PWR On
3
GND
5
D 13.2 V
7
A 13.2 V
9
GND
DRV On
(Inverter –On)
A18
Established
2014. 06 .10
date
Revised
date
(32/43) N.C
2
(49/55) PWM #2
4
D 13.2 V
6
D 13.2 V
8
A 13.2 V
10
GND
12
PWM #1
A18
LGE Internal Use Only

Hide quick links:

Advertisement

loading

This manual is also suitable for:

32se3b