Download Print this page
Huawei B2368 Quick Start Manual
Hide thumbs Also See for B2368:

Advertisement

Quick Links

B2368 Quick Start Guide
Part number: 31071064
Issue: 01
1
Packing List
Before installing the CPE, verify that you have all the items listed in the packing list. If any of the items is missing or damaged, contact your LTE device provider.
1 x indoor unit (IDU)
1 x outdoor unit (ODU)
1 x Quick Start Guide
Prepare the following tools:
M6 inner hexagon wrench
Phillips screwdriver
Adjustable spanner
If you need to install mounting kits on wood materials, prepare screws (recommended model: ST4.2 with length ≥ 25 mm).
2
Basic Information
ODU indicators
Steady green
LTE signals are strong.
Blinking green
The ODU is starting.
Steady blue
LTE signals are medium.
Steady orange
LTE signals are weak.
Blinking orange
There is no LTE signal or the device
is searching for LTE signals or
disconnected.
Steady red
System error (such as PoE barrier and key
module damage), SIM
card fault, or an illegal SIM card
Blinking red
The ODU is upgrading.
Off
The LTE device is powered off.
IDU indicators
Steady green
The LTE device is running properly.
Blinking green
The LTE device is booting up.
Steady red
The LTE device detects an error during
self-testing, the device
is faulty, or there is no SIM card.
Blinking red
The LTE device is upgrading firmware.
Off
The LTE device is powered off.
Steady green
LTE signals are strong.
Steady blue
LTE signals are medium.
Steady orange
LTE signals are weak.
Blinking orange
There is no LTE signal, or the LTE device is
receiving power and ready for use.
3
Working Principle and Installation Position
An ODU is an LTE wireless signal receiving and transmission unit. You are advised to install ODUs in open areas without obstacles on suitable walls,
balconies, and roofs. You can power on an ODU to test signal quality and choose a location with better signal quality for installation.
B2368 ODU can be installed at various locations, including planes, slopes, walls, and poles (horizontally or vertically).
4 x M6 expanding screw
For mounting on the wall
1 x power adapter
2 x metal belt
For mounting on a pole (φ48 mm to φ114 mm)
1 x Cat5e Ethernet cable
For connecting the IDU and PC
1 x mounting kit
Cat5e Ethernet cable
For connecting the ODU and IDU
Rubber hammer
Optional for mounting on a wall
Cable connections
PWR
PWR
PoE
PoE
LAN 0~2
LAN 0-2
PC
IDU buttons
Reset button:
Press for 3s to 10s to reboot the device.
Press for more than 10s to restore factory settings.
Reset button
Power button
WPS button
WPS button:
Press for 1 second to enable or disable Wi-Fi.
Press for 10s to enable the WPS function.
You do not need to adjust the ODU angle thanks to a unique design of ODU. Pay attention to the following notes when selecting an insatllation
location:
An ODU must be within the lightning rod protection scope (45 degrees) to avoid being damaged by a lightning strike. If an ODU is installed on a
rooftop, the ODU must be less than 2 m above the rooftop.
ODU performance varies according to the installation position and nearby obstacles, especially metal objects. You are advised to install an ODU
in an open area without obstacles.
Basic connection
lightning rods
Lightning rod
1 x PG connector
2 x positioning pin
(one as a spare)
Percussion drill
IDU and ODU cables can be routed outdoors through
existing holes (such as those for air conditioning) on
walls or windows, or through dedicated holes drilled
professionally.
4
ODU Installation
1
Take out the ODU and insert a micro-SIM (3FF) card.
TEL
TEL
Phone
3
Install mounting kits.
Mounting on a wall
Recommended: φ8
40 mm to 45 mm
Maintain a horizontal position.
Recommended locations
45°
45°
Roof
ODU
Cat5e
Balcony
Power supply
IDU
M3
The direction of the SIM card must be consistent as
Insert the SIM card in the direction shown in the
the figure to avoid the damage to the device and the
above figure to avoid damages to the device or SIM
SIM.
card.
Tighten screws to prevent water from entering the
ODU.
0.5 N•m
OR
M6
7 N•m
Balcony
Wall
Roof
Pole
Wall
2
Connect the ODU to IDU, and power on the ODU and IDU.
Test LTE signals to select a suitable ODU installation
location.
After an installation position is selected,
disconnect the ODU and cables.
Mounting on a pole
M6
a
7 N•m
1
2
3
3

Advertisement

loading

Summary of Contents for Huawei B2368

  • Page 1 You can power on an ODU to test signal quality and choose a location with better signal quality for installation. B2368 ODU can be installed at various locations, including planes, slopes, walls, and poles (horizontally or vertically).
  • Page 2 Tighten the PG connector to prevent water from entering the ODU. Firmly install the ODU to avoid shedding and damages to human bodies or Otherwise, electric shocks or fires may occur. the equipment. · Ensure that the power adapter meets the specifications indicated on its nameplate. Copyright © Huawei Technologies Co., Ltd. 2018. All rights reserved.