How to set Option
1. You must start the key operation within 10 minutes after
turning on the power for setting options.
2. When you press the Menu and Shift key at the same time,
the following option screen will be shown.
• Product selection 
When the first two digits flash, you can use the ▲ or ▼ key to set the product.
[00] -> Unit (Don't set this condition , when using special connection is needed)
[10] -> Slave (when using in connection with ACP)
[11] -> Master (when not using in connection with ACP)
Ex) Product selection: Master, Watt meter: 1W/1 pulse
[11] : Independent operation of PDI
1 1 0 0 0 0 0 0 0 M a s t e r 1 W / p
M I C R O N I C
Initial Screen
E L E C T R I C P O W E R
D I S T R I B U T O R
Option setup screen
1 1 0 0 0 0 0 0 0 U n i t
M I C R O N I C
N O -
S T B P
Installation
Press Menu and Shift
at same time
1 W / p
N O -
S T B P