Overall Systems Check And Listening Test - Sony DFP-D3000 Quick Start Manual

Cinema processor system
Table of Contents

Advertisement

7.

Overall systems check and listening test.

The basic installation, alignment, and test of the DFP-3000 Cinema Processor System is now complete.
Before signing off on the job, the installer will want to play familiar reference films and listen in the
house to confirm that all is well. It might also be a good idea to repeat the synchronization test of 6.13
with actual film. Adjust the fine lipsync if necessary; using the front panel for this will require the
"SDDS" password.
7-1
DFP-3000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dfp-r3000

Table of Contents