18 | Commissioning, inspection and maintenance reports

8
Commissioning, inspection and
maintenance reports
DANGER: Risk to life by falling from roof!
▶ Whilst working on the roof, take all necessary
precautions against a possible fall.
▶ If there are no general anti-fall safety devices
available, wear personal protective equipment.
DANGER: Danger to life through electric shock!
▶ Before carrying out work on electrical components,
isolate them from the power supply (230 V AC) (fuse,
circuit breaker) and secure against unintentional
reconnection.
Commissioning, inspection and maintenance may only
be carried out by authorised contractors.
Follow the instructions for the components.
We recommend conducting the first inspection or maintenance after
approx. 500 hours.
▶ Test (inspect) solar systems at least once every 2 years. Immediately
remedy all faults (maintenance).
▶ Perform activities and fill out log.
6 720 811 270 (2015/04)
AGS10-2, AGS10E-2, AGS20-2, AGS50-2