BEFORE YOU BEGIN
Read these instructions completely and carefully.
RISK OF ELECTRIC SHOCK
• Turn power off before inspection, installation or removal.
• Properly ground electrical enclosure.
RISK OF FIRE
• Follow all NEC and local codes.
• Use only UL approved wire for input/output connections.
Minimum size 18 AWG (0.75mm
Save These Instructions
Use only in the manner intended by the manufacturer.
If you have any questions, contact the manufacturer.
Components Supplied
Luminaire
Tools and Components Required
Slot or Philips screwdriver
UL Listed conduit connections per NEC/CEC for nominal
conduit trade sizes ½" or ¾"
UL Listed wire connectors
imagination at work
LED Luminaires
TM
WARNING/AVERTISSEMENT
).
2
LVT 22 Series
RISQUES DE DÉCHARGES ÉLECTRIQUES
• Coupez l'alimentation avant d''inspecter, installer ou déplacer le luminaire.
• Assurez-vous de correctement mettre à la terre le boîtier d'alimentation électrique.
RISQUES D'INCENDIE
• Respectez tous les codes NEC et codes locaux.
• N'utilisez que des fils approuvés par UL pour les entrées/sorties de connexion.
Taille minimum 18 AWG (0.75mm
Prepare Electrical Wiring
Electrical Requirements
The LED luminaire must be connected to the mains supply
according to its ratings on the product label.
Grounding Instructions
The grounding and bonding of the overall system shall
be done in accordance with National Electric Code (NEC)
Article 600 and local codes.
Installation Guide
LVT 14 Series
).
2

Advertisement

loading

Summary of Contents for GE Lumination LVT 24 Series

  • Page 1 Installation Guide Lighting Lumination LED Luminaires (LVT Series, 120-277V and 347V) LVT 24 Series LVT 22 Series LVT 14 Series BEFORE YOU BEGIN Read these instructions completely and carefully. WARNING/AVERTISSEMENT RISK OF ELECTRIC SHOCK RISQUES DE DÉCHARGES ÉLECTRIQUES • Turn power off before inspection, installation or removal. •...
  • Page 2 Luminaire Installation Carefully unpack unit from its packaging. Properly Install the unit into the reserved hole in the ceiling. inspect for defects before installing. Wear work gloves to prevent dirt and oil from being transferred to the luminaire. Screw is disengaged Screw is engaged Safety cable Squeeze...
  • Page 3 GE and the GE Monogram are trademarks of the General Electric Company. All other trademarks are the property of their respective owners. Information provided is subject to change without notice. All values are design or typical values when measured under laboratory conditions. GE Lighting is a business of the General Electric Company. © 2016 GE.

This manual is also suitable for:

Lumination lvt seriesLumination lvt 22 seriesLumination lvt 14 series