Installation - Husqvarna DS900 Operator's Manual

Hide thumbs Also See for DS900:
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 1
Procedures for drill stand installation
There are 2 procedures that can be used to attach the
drill stand before a drill operation:
With an expander bolt.
With an all thread rod, a washer and a locknut.
WARNING: Do not install the product with a
vacuum plate. There is a risk that the
product becomes loose during operation.
To install the product with an expander bolt
WARNING: To install the product to a ceiling
or a wall puts much strain on the surface.
For operation in ceilings and walls, use only
an expander bolt or anchor screw that is
applicable for the strain.
1. Drill a hole for the expander bolt at a distance (A) of
400 mm/15.7 in. from the center of the hole that you
will drill.
Note: The distance is for drill motor DM650 without a
spacer.
2. Attach the bottom plate with an expander bolt.
3. Make sure that the expander bolt is tightened
correctly.
8

Installation

4. If it is necessary, adjust the bottom plate. Turn the
adjustment screws until the bottom plate is parallel to
the surface.
To attach the expander bolt
1. Drill a hole for the expander bolt. Make sure that the
depth is sufficient. The socket must be put below the
surface.
1324 - 001 - 11.10.2019

Advertisement

Table of Contents
loading

Table of Contents