Commissioning - Siemens SINAMICS V20 Manual

Simple speed control, using the uss protocol
Hide thumbs Also See for SINAMICS V20:
Table of Contents

Advertisement

5 Installation and Commissioning

5.3 Commissioning

No.
6.
If you want to use the simulation in TIA Portal, you have to set the PG/PC interface in the control
panel of your development system (this step is not necessary if you are using a real operator panel
instead of the simulation).
Go to Control Panel > All Control Panel Items >
Select the access point of the application (S7ONLINE (STEP 7)) and the interface parameter
assignment (network card) you are using. Select the one with the ...TCPIP.Auto.1 extension.
Select OK to close the window.
7.
If you are using a real operator panel, download HMI_1 to the KTP600.
When the "Extended download" window appears, proceed in the same way as when downloading
the PLC (see step 5 of this table).
After successful downloading, the configured start screen appears on the operator panel.
5.3
Commissioning
A specific commissioning routine is not required. Provided that you have performed
the hardware and software installation described above, you only have to energize
the power circuit for the SINAMICS V20 if this has not already been done. The next
steps are described in the following chapter, 6 "Operation of the Application".
SINAMICS V20 at S7-1200/1500 via USS
Entry ID: 109480894,
V1.0,
KTP600
09/2018
Action
32

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-1200Simatic s7-1500

Table of Contents