Wiring; Using - LG PVDSMN000 Installation & Owner's Manual

Air conditioner
Table of Contents

Advertisement

③ Setting of Rotary switch :
Use the Rotary Switch to set a control step
for contact signal input : The type of input
signal and control step can be set using
SW104. This function is for demand control
to reduce power Consumption. Set the
control mode what you want According to
the table as below.
- Type of input signal
SW_STEP
0, 1, 2, 3, 4, 5, 6, 7
Contact signal input
C, D, E
Analog input signal
!
CAUTION
Do not change a command too quickly.
Keep the command 30 seconds at least,
otherwise it will cause a damage to out-
door unit.
• Operation rate condition :
- Cooling : Outdoor 35 °C, Indoor 27 °C
- Heating : Outdoor 7 °C, Indoor 20 °C
• The tolerance of the operation rate can
be cause by combination of outdoor
unit, operating condition, installation cir-
cumstance.
• When operation rate is 100%, Target
Evaporating Temp. and Target
Condensing Temp. can be changed by
installation option. (Refer to product data
book)
• Input_1 : 0  OFF, Input_1 : 1  ON

Wiring

Power
Error Status
AC or DC
Power
Operating Status
AC or DC
Input signal
AO_4
AO_3
AO_2
AO_1
SETTING AND USING METHOD
AI : Analog Input (DC 0 ~ 10 V)
AO : Analog Output ( DC 0 ~ 10 V, Max 20 mA)
Input_LNO : Low Noise Operation
① Dry contact input part
Connect Non Voltage contact signal for
demand control (3 step)
* Priority setting
Using 'Priority setting' contact signal,
set the priority of command.
(External command from DDC Vs
Command from LG central controller.)
- Close : Central controller has priority
to external signal.
- Open : External signal has priority to
central controller.
② Analog input part
Connect Analog input signal for demand
control (10 step)
③ Analog output part
Connect Analog output signal for con-
trolling third party devices.
Ex) Valve actuator for variable water
flow. Damper actuator for Low Ambient
Kit
④ Digital output part
Connect status display devices.
!
CAUTION
Power must be turned on after the prod-
uct is wired completely.

Using

* Refer to Wiring Picture.
1. Demand control :Using Demand Control
function with 3-Non Voltage contact.
With this function comp capacity of outdoor
unit can be controlled.
Ex) Demand control by 3-contact signal.
SW_
Input_1Input_2Input_3
STEP
0
0
1
0
0
0
1
0
0
7
Comp
Type
capacity
of
Of outdoor
input
unit(%)
0
No control
Conta
0
70
ct sig-
0
40
nal
1
Comp off

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents