Craftsman 14927 Operator's Manual page 3

3-drawer accessory
Hide thumbs Also See for 14927:
Table of Contents

Advertisement

Available languages

Available languages

asseMBLy
items needed:
Side (Qty:1)
Screw Leveler (Qty: 2)
process:
• Ensure that the leveling screws on the existing
workbench are extended to at least (1.5) inch, (38 mm).
(See leveling foot adjustment.)
Figure 1.1
• Assemble (2) Screw Levelers in Side. Make sure both
Levelers are fully retracted in Side.
Figure 1.2
items needed:
Front Rail (Qty: 1)
1/4-20 x 5/8" carriage Bolt (Qty: 10)
5/16" washer (Qty: 10)
1/4-20 Serrated Flange Nut (Qty: 10)
note: when installing on 8' workbench, remove inner
support rails before installing side.
process:
note: Drawer kit may be installed on left or right side.
Installation shown on right side.
• Install Side using (6) 1/4-20 x 5/8" carriage Bolt, (6)
5/16" washer, (6) 1/4-20 Serrated Flange Nut.
• Attach Front Rail, as shown, using (4) 1/4-20 x 5/8"
carriage Bolt, (4) 5/16" washer, and (4) 1/4-20 Serrated
Flange Nut.
• Finger tighten.
• Adjust bench to desired height. (See leveling
foot adjustment.)
1.5"
(38 mm)
Bolt
Side
Figure 2
Leveler
3
Side
Nut
washer
Front Rail

Advertisement

Table of Contents
loading

This manual is also suitable for:

14926

Table of Contents