HP Indigo MegaRAID iTBBU02 Installation Instructions Manual

Battery

Advertisement

Quick Links

Replacing the MegaRAID iTBBU02 Battery

Purpose

ISSUE:
SOLUTION:

Installation instruction details

Item
Objective
Scope
Document number
Kit number
Date
Related ECO
Security level
Contents
Purpose ....................................................................................................................................................1
Installation instruction details ...................................................................................................................1
Overview...................................................................................................................................................2
Prerequisites.............................................................................................................................................2
Estimated installation time........................................................................................................................2
Special skills .............................................................................................................................................2
Special jigs and tools................................................................................................................................2
Parts list....................................................................................................................................................2
Kit contents..........................................................................................................................................2
Spare parts..........................................................................................................................................2
Pre-installation procedure ........................................................................................................................2
Procedure .................................................................................................................................................3
Test procedure .........................................................................................................................................8
Revision history ......................................................................................................................................10
Confidentiality Notice..............................................................................................................................10
filename: CA293-04780.doc
HP Indigo Division Installation Instructions
Expired or defective batteries.
Replace with new spare part battery.
Details
Spare part
HP Indigo Production Manager - 8-RIP - Base B - Rack unit:
Q4912A #416 - HPIPM 8-RIP BASE B (EMEA)
Q4912A #ABA - HPIPM 8-RIP BASE B (NA/JP)
CA293-04780
5188-6493
4-Sep-07
N/A
HP confidential
page 1 of 10

Advertisement

Table of Contents
loading

Summary of Contents for HP Indigo MegaRAID iTBBU02

  • Page 1: Table Of Contents

    Installation instruction details Item Details Objective Spare part Scope HP Indigo Production Manager - 8-RIP - Base B - Rack unit: • Q4912A #416 - HPIPM 8-RIP BASE B (EMEA) • Q4912A #ABA - HPIPM 8-RIP BASE B (NA/JP) CA293-04780...
  • Page 2: Overview

    Replacing the MegaRAID iTBBU02 Battery Overview This installation instruction describes how to replace the MegaRAID iTBBU02 battery for the image memory drive LSI RAID controller. Prerequisites None Estimated installation time 30 minutes Special skills Special jigs and tools Electrostatic wrist strap Parts list Kit contents L3-01089-01B...
  • Page 3: Procedure

    Replacing the MegaRAID iTBBU02 Battery Procedure Open the front door of the server rack, locate the DL380 G5 core server at the top of the rack, and shut down the core server. Pull down the mounting screw covers on the right and left sides of the rack. Figure 1: Locating the server mounting screw covers Right mounting screw cover Left mounting screw cover...
  • Page 4 Replacing the MegaRAID iTBBU02 Battery To remove the top cover: Unscrew the top cover latch screw. Lift the top cover latch. Slide the top cover toward the rear of the server. Lift the cover at the front. Figure 2: Removing the top cover Top cover PCI riser cage Front of server...
  • Page 5 Replacing the MegaRAID iTBBU02 Battery Disconnect the RAID cable from the PCI riser cage. Figure 4 Locating the RAID cable RAID cable To release the screw caps, press the four blue screw covers that hold the PCI riser cage in place.
  • Page 6 Replacing the MegaRAID iTBBU02 Battery Locate the LSI RAID board at the bottom of the cage. The board has a white battery pack mounted on the memory module. Figure 6 Locating and releasing the LSI RAID board Battery pack Securing screw LSI RAID board Remove the securing screw.
  • Page 7 Replacing the MegaRAID iTBBU02 Battery Verify that the cage rails are aligned with the chassis guides. Figure 7 Remounting the PCI riser cage in the server chassis PCI riser cage rails Chassis guides Secure the PCI riser cage with the securing screws. Press the four blue screw covers to lock them.
  • Page 8: Test Procedure

    Replacing the MegaRAID iTBBU02 Battery Test procedure Turn on the core server. After completion of the power-up sequence, log in using the Unicorn account. Select Start and Run. Type cmd and click OK. The Command Prompt window appears. At the DOS prompt, type megacli –AdpBbuCmd –GetBbuStatus –a0 and press Enter. Examine the Command Prompt window: •...
  • Page 9 If any parts listed in the BOM are missing or faulty, enter the following information from the Quality Control label on the packing box: HP Indigo Quality Control no:.__________________ Date:___________________ Detail the missing or faulty parts in the general remarks field below.
  • Page 10: Revision History

    Replacing the MegaRAID iTBBU02 Battery Revision history Revision Description Initial document Responsible engineer Evgeny Landau Signature: date: Group manager Ike Miller Signature: date: R&D engineer Glen Oliarny Signature: date: Engineering Shaun Purcell Signature: date: Documentation manager Ronit Shugal Signature: date: Configuration control Na'ama Konnor Gal Signature:...

Table of Contents