Download Print this page

Specifications - Toshiba T1-40 PLC Specification

Programmable controllers, protocol converters for toshiba plcs

Advertisement

Gateway Modes
There are two communications ports on the Gateway, labeled PLC1 and PLC2. Each port can be
configured for either RS232 or RS485 operation. Gateway can communicate through either the T-Series
RS232 programming port or the RS485 computer link port.
Gateway Setup
Gateway is setup using simple MS Windows setup software. The software allows devices/registers from
one device to be mapped to devices/registers of the other device. For Modbus, the 400001 numbered
holding registers can be mapped directly to D data registers in the Toshiba PLC.
In the above example, 5 data registers in the T1 PLC starting at D101 are written into PID controller
modbus registers starting with holding register 400001. 3 Holding registers in the PID controller are
written into the data registers of the T1 starting at D0 (D0 –D2). It is also possible to control the priority
and frequency of the data transfer using the Gateway setup software.

Specifications

Power Supply:
Communication:
Status LEDs:
Temperature:
Humidity:
Immunity to ESD:
Immunity to Transients:
Radiated Susceptibility:
Emissions:
Dimensions:
Weight:
24 VDC +/- 5 % (50 ma MAX.) No Fuse inside
5 VDC +/- 5 % FROM PLC (120 ma MAX.)
Two ports as follows:
Com 1: RS232C/RS485
Com 2: RS232C/RS485
PLC1 LED
STATUS LED
PLC2 LED
Operating: 0 to 60 °C
10% to 90% (Non condensing)
Level 3 as per IEC1000-4-2
Level 3 as per IEC1000-4-4
Level 3 as per IEC1000-4-3
EN55011 CISPR A
97mm(W) X 15.mm (H) X 42mm(D) DIN RAIL mounting
available
100 gm Approx.
Page 3
Storage: - 40 to 90 °C

Advertisement

loading

This manual is also suitable for:

Gwy-02Gwy-08