Battery Lead Supervision Wiring - Bosch B6512 Installation Manual

Hide thumbs Also See for B6512:
Table of Contents

Advertisement

Control panels
Callout ᅳ Description
4 ᅳ D122/D122L, as required
5 ᅳ Batteries (unsupervised)
6 ᅳ Audible signaling device
7 ᅳ UL Listed four-wire smoke detectors with EOL
resistor
7.2

Battery lead supervision wiring

BAT 2-
BAT 2+
BAT 1-
BAT 1+
Callout ᅳ Description
1 ᅳ D113 Supervision module, battery lead, if required
2 ᅳ Batteries
3 ᅳ To supervision point
4 ᅳ Control panel
Bosch Security Systems B.V.
CHGR-
VAUX+
SUPV
CHGR+
Callout ᅳ Description
11 ᅳ Programmable outputs
12 ᅳ External relay
13 ᅳ USB connector
14 ᅳ RJ-45 modular jack for Ethernet (optional)
NO C NC
18VAC
+ BAT -
OUTPUT A
UL Installation manual
System wiring diagrams | en
COM AUX
R
Y
G
B
1
C
O
M
2
3
COM
4
5
COM
PWR A
B COM
2019-12 | 10 | F.01U.287.185
23
7 COM 8
6
7
C
O
M
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

B5512B4512B3512B5512eB4512eB3512e

Table of Contents