Page 2
Installing the Unit Scenario Rack-mounting NOTICE Front When installing, ensure that the PDU rear panel is aligned with the UPS rear panel. Rear Installing Cables Connecting the UPS NOTE 1. Connect a power cable from UPS input to UPS input outlet on the unit. Use another power cable to connect UPS output to UPS output outlet on the unit.
Page 3
Connecting Equipment NOTICE 1. The master/slave function is disabled by default. Ensure that the master/slave function switch is on the disable status before operation. 2. Only when the master/slave function is enabled, loads connected to slave outlets will be shut down after load is detected lower than 10 W in master outlet.
Page 4
Master Load < 10 W Output Status Master/slave Slave On indicator function is enabled Slave output Slave On indicator Master/slave function is disabled Slave output HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China www.huawei.com...