Set up a Leak Test

1) Set the Utility
2) Set the Leak Test
options
TAP the window
(Maximise)
1
Steps 5 and 6: Set the Test Time
+ Set the Wait Time (if necessary)
5
4-4 Pressure indicator operation (MC 620)
When all the software selections are complete, make the
applicable pressure and electrical connections. Examples:

Measure pressure

Set the Utility to Leak Test
When you have set the Utility to Leak Test, you can set these
options:
Wait Time: The time before the test starts in
hours:minutes:seconds (hh:mm:ss)
Test Time: The period of the leak test in
hours:minutes:seconds (hh:mm:ss)
Note: To set the Leak Test options, you must have a pressure
module correctly installed
Select Leak Test
Select Settings
2
Go back to the Home window. Start the test
when the pressure system is set up.
6
(Section
4.4.4)
(Section
2.10.6).
(Section
4.2.1).
Select Test Time
3
Start the test and let it
7
complete.
Stop the test (with no results)
4