6
System Connection
Notice: Must strictly follow the below sequence, or it will introduce difficulty on installation.
1. Put battery
into the pole.
3. FIRSTLY, connect luminaire to
the controller
4. SECONDLY, connect NTC to
the controller
5. THIRDLY, connect battery to
the controller
6. LASTLY, connect PV
Panel to the controller
7. Check controller indicator
lighting status
LED 1: Green on
LED 2: Green on or flash
LED 3: Red off
8. Lock the service door at the end.
2. Affix controller on
the beam of the pole
with four screws.