15-30 kVA Seismic Adapter Kit (Cont.)
1. Prepare the floor anchorages. Arrange the anchorages to ac-
commodate the final layout including placement of ancillary bat-
tery and/or Auxiliary cabinets.
2. Prepare the wall anchorages. Key measurements off the an-
chorage placement in Step 1.
3. Table 1 lists the components of the 30kVA Seismic Kit.
1.5
show the Seismic anchorage components in the Seismic Kit
for the 30kVA cabinets.
4. Assemble the fastener groups in Table 1, [4a-4c], [10a-10c], and
[11a-11c] as shown in
5. Secure the Top Seismic Bracket [1] to the top rear of the UPS
using two (2) fastener group [11].
6. Secure the Base Mounting Bracket, [3], to the floor anchors
installed in Step 1.
7. Roll the 15-30 kVA UPS cabinet between the two vertical sides of
the Base Mounting Bracket, [4].
8. Line up the UPS so the bolt holes on the Bottom Seismic Brack-
ets line up with the holes on the Seismic Base Plate vertical
sides.
9. Secure the UPS to the Seismic Base Plate using the remaining
eight (8) fastener group [11]. Insert the bolts through the Seismic
Bracket to the welded nuts on the Seismic Base Plate.
1.6)
10. Secure the Top Seismic Bracket, [1], to the wall anchors installed
in Step 2.
11. Once installation is complete, use the single Fastener Group [4]
to secure the door of the UPS.
FIgUrE 1.4: TOP SEISMIC BrACKET INSTALLATION
2
(Figure
1.2)
(Figure
1.3)
Figure
1.1.
(Figure
1.4)
1.6)
(Figure
(Figure
1.7)
11
1
Figure
FIgUrE 1.3: 15-30KVA SEISMIC
ANCHOrAgE - WALL PATTErN
(Figure
11
4400 Series UPS Seismic Kit Installation Instructions – 94016-002
10.05 in
(255 mm)
5 in (127 mm)
1/4" Bolt
Anchor (2)
9.27 in
(471 mm)
Base Mounting Bracket
1
4
P/N 440300SEISMICKIT
FIgUrE 1.5: SEISMIC KIT
COMPONENTS (15-30 KVA)
2