Download Print this page
GE Spectra K-frame Installation Instructions
GE Spectra K-frame Installation Instructions

GE Spectra K-frame Installation Instructions

Retrofit with abb tmax xt7 breaker single mount (bolt-on kits)

Advertisement

Quick Links

1
I N S TA L L AT I O N I N S T R U C T I O N S
Retrofit of Spectra K-frame with ABB Tmax XT7 breaker
Single Mount (Bolt-On kits)
WARNING
Danger of electrical shock or injury. Turn OFF power ahead of the panel board or switchboard before working inside the equipment
or removing any component. Equipment is to be installed and maintained by properly trained and qualified personnel only.
General
These instructions are applicable to retrofit of Spectra K-frame with ABB Tmax XT7 breaker.
Table 1 lists the parts included in the bolt-on circuit breaker kits for single branch configurations.
Installation
Numbers in brackets in the following instructions and figures refer to the item numbers in table below.
Retrofit Kit
Item
Part
Description
1
1/4 - 20 x 1.50" carriage bolt
2
1/4 - Belleville Washer
3
1/4 - 20 Nut
4
Breaker mounting bracket
5
Thread-forming screw #10-32
6
Flange Nut - Thread size 3/8-16
7
Socket Head Screw # 10-32 UNF x 4 IN
8
L-Shaped Barrier
9
Filler plate
10
Busbar Link assembly - C phase
Item
Part
Qty.
11
6
12
6
13
6
14
1
6
6
Required Tools
2
Below listed tools are required for installation
Item
Part
1
1
1
1
Description
Busbar Link assembly - B phase
Busbar Link assembly - A phase
Kit-Foldable Handle, XT7 (for panel
application)
Terminal Cover, XT7 (HTC)
Description
Torque wrench
Qty.
1
1
1
1
Table 1. Retrofit kit

Advertisement

loading

Summary of Contents for GE Spectra K-frame

  • Page 1 Equipment is to be installed and maintained by properly trained and qualified personnel only. General These instructions are applicable to retrofit of Spectra K-frame with ABB Tmax XT7 breaker. Table 1 lists the parts included in the bolt-on circuit breaker kits for single branch configurations.
  • Page 2 STEP 1 STEP 2 Prepare the breaker, install required lugs and identify the re- Remove flat cap and install foldable handle assembly (13) and quired mounting and termination accessories from circuit tighten the screw. breaker kit. Refer to breaker instruction document for more infor- mation.
  • Page 3 STEP 7 STEP 7 Continued Install breaker with L-shaped barrier assembly [from STEP 6]. Refer figure 7a. Tighten Socket head screw [7] and flange nut [6], torque the screw [7] to 22 lb-in. Torque the flange Nut [6] to 160 lb-in.
  • Page 4 ABB Inc. We reserve the right to make technical We reserve all rights in this document and in GE logo is licensed by General 305 Gregson Drive changes or modify the contents of this doc- the subject matter and illustrations con-...