Download Print this page
Siemens VersiCharge VCPOST Installation Instructions

Siemens VersiCharge VCPOST Installation Instructions

Electric vehicle charging station post for use with vc30gryu and vcsg30gryuw

Advertisement

Quick Links

These instructions do not purport to cover all details or variations in equipment, or to provide for every possible
contingency to be met in connection with installation, operation, or maintenance. Should further information be
desired or should particular problems arise which are not covered sufficiently for the purchaser's purposes, the
matter should be referred to the local Siemens sales office or Siemens Customer Service available at 1-800-
SIEMENS. The contents of this Instruction Manual shall not become part of or modify any prior or existing
agreement, commitment, or relationship. The sales contract contains the entire obligation of Siemens. The
warranty contained in the contract between the parties is the sole warranty of Siemens. Any statements
contained herein do not create new warranties or modify the existing warranty.
© 2015 Copyright Siemens
® The National Electrical Code is a registered
Industry, Inc.
trademark of the National Fire Protection Association
Siemens Industry, Inc.
Norcross, Georgia U.S.A.
NOTE: This instruction outlines the recommended
general procedure for installation by a qualified
person, as defined by all local electrical codes
and/or the National Electrical Code ®.
PERMITS: Be aware that many areas require
special permits and/or utility approvals to install EV
charging equipment. Contact your local electrical
inspector's office and your local utility prior to
beginning work to understand local requirements.
WARRANTY: See Siemens' standard terms and
conditions below with regards to warranty of
purchase.
www.usa.siemens.com/VersiChargeWarranty
TOUCH UP PAINT: See link below for replacement
paint if needed for aesthetic restoration throughout
life of post:
http://www.lowvolumepowder.com/RAL7035-Color-
Plate
Page 4 of 4
© 2015 Copyright Siemens
Industry, Inc.
Installation Instructions for
VersiCharge Electric Vehicle
For use with VC30GRYU
Charging Station Post
and VCSG30GRYUW
Catalog Number:
DANGER
Hazardous voltage. Will cause death or
serious injury.
Disconnect before working on this
equipment.
This indicates a situation where the
present voltage could cause injury or death.
Extreme caution is required when servicing or
installing the equipment referenced.
DANGER
Explosion hazard. This equipment has
arcing or sparking parts that should not be exposed
to flammable vapors. Use extreme caution and
follow instructions carefully.
WARNING!
This indicates a situation where failure
to follow instructions may be a safety hazard or
cause equipment malfunction. Use extreme caution
and follow instructions carefully.
Applications include any public or private place where Electric
Vehicle charging is required. These places may include homes,
both single and multifamily, places of business, commercial
institutions, etc.
Provision for Padlock (sold separately) optional
padlock is used to supplement the connection
between the enclosure top and enclosure base at
designated location
NOTE: All tamper resistant and button head socket cap
screw locations are called out on the image to the left
and in the images on page 2. Every location requires a
washer to be used under the bolt head. Mounting screw
torques are as follows:
Material # 8&9: 12 ±.5 lb-ins
Material # 11: 18 ±.5 lb-ins
® The National Electrical Code is a registered
trademark of the National Fire Protection Association
Document # 814852
Rev. 0P
VCPOST
Page 1 of 4

Advertisement

loading

Summary of Contents for Siemens VersiCharge VCPOST

  • Page 1 Siemens sales office or Siemens Customer Service available at 1-800- and in the images on page 2. Every location requires a SIEMENS. The contents of this Instruction Manual shall not become part of or modify any prior or existing washer to be used under the bolt head. Mounting screw agreement, commitment, or relationship.
  • Page 2 This method will cause a gap between the base of the post and cement, increase conduit height above cement accordingly (minimum of 3”). See next page for post mounting instructions. © 2015 Copyright Siemens ® The National Electrical Code is a registered Page 2 of 4 ©...