Husqvarna ST 224 Operator's Manual page 10

Hide thumbs Also See for ST 224:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
2. Adjust the handle position to one of the mounting
holes (B) and tighten the handle knobs (C) with the
carriage bolts (D).
D
3. Install more carriage bolts (D) and handle knobs (C)
to secure the upper handle (A) to the lower handle
(E).
A
D
E
To install the chute deflector and chute
rotator head
1. Put the chute deflector assembly on the top of the
chute base with the discharge opening in the
direction of the front of the product.
10
2. Put the chute rotator head (A) on the chute bracket
(B). Rotate the chute assembly to align the pins
under the chute rotator head with the holes in the
chute bracket if it is necessary.
3. Put the chute rotator head on the pin (C) and the
threaded stud (D) on the mounting bracket (E).
4. Attach a locknut (G) on the threaded stud and
tighten.
B
C
5. Put the cables through the cable guide (F) and the
double clip (I) to attach the rotator cable (H) to the
lower handle.
C
To install the chute deflector remote
control
1. Attach the remote cable bracket (A) to the discharge
chute with a carriage bolt (B) and a 5/16-18 locknut
(D). Tighten the bolt.
A
B
D
H
I
673 - 003 - 08.01.2020
G
F
C
E
F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

St 227pSt 230p

Table of Contents