Verifying The Installation - Huawei SUN2000 Series Quick Manual

Hide thumbs Also See for SUN2000 Series:
Table of Contents

Advertisement

2. Connect the signal cable connector to the communications port.
Communications
port (COM)
5

Verifying the Installation

No.
Acceptance Criteria
1
The solar inverter is installed correctly and securely.
2
The cables are routed properly as required by the customer.
3
The communications expansion module is installed correctly and securely.
4
Cable ties are evenly distributed and no burr exists.
5
The PE cable is connected correctly and securely.
6
The DC switch and all the switches connected to the solar inverter are set to the OFF
position.
7
The AC output power cable, DC input power cables, and signal cable are connected
correctly and securely.
8
Unused terminals and ports are locked by watertight caps.
9
The installation space is proper, and the installation environment is clean and tidy.