Download Print this page

Specification - Sealey SSCL1 V2 Manual

Platform scaffold stand
Hide thumbs Also See for SSCL1 V2:

Advertisement

SSCL3: Extension Kit for the SSCL1 Scaffold Tower System Increases the platform height to 3.5mtr and the working height to 5.5mtr. Supplied with
stability legs to stabilise unit and an extra trap door platform.
SSCL4: Extension Kit to be used with SSCL1 & SSCL3. Further increases the platform height to 5.15mtr and the working height to 7.15mtr.

3. SpECIFICATION

Model No: ............................................................. SSCL1.V2
Width: ......................................................................... 860mm
Length: ..................................................................... 1780mm
Maximum Working Height: ........................................... 3.8mtr
Maximum Platform Height: ........................................... 1.8mtr
Weight: ........................................................................ 44.8kg
Model No: ...................................................................SSCL3
Width: ....................................................................... 1780mm
Width with support legs: ........................................... 3810mm
Depth ......................................................................... 860mm
Maximum Working Height: ......................................... 5.5mtr*
Maximum Platform Height: ......................................... 3.5mtr*
Maximum capacity ....................................................... 200kg
Weight: ........................................................................... 35kg
*Only when used with SSCL1
Model No: ...................................................................SSCL4
Width: ....................................................................... 1780mm
Width with support legs: ........................................... 3810mm
Depth ......................................................................... 860mm
Maximum Working Height: ...................................... 7.15mtr**
Maximum Platform Height: ...................................... 5.15mtr**
Maximum capacity ....................................................... 200kg
Weight: ........................................................................... 10kg
** Only when used with SSCL1 & SSCL3
4. SSCL1.V2 CONTENTS
Reference
A
Folding base frame with fitted wheels
B
Diagonal Brace
C
Horizontal brace
D
1m Guardrail end frame
E
Toe board set (2 long side, 2 short end) 1
H
Trapdoor Platform
5. SSCL1.V2 ASSEMBLY
NOTE: The mobile scaffold tower may only be assembled, used
and dismantled by persons familiar with these Assembly and
Use Instructions.
5.1.
Open folding base A and insert the locking pin in the centre of the
folding section. (See fig.1)
5.2.
Place diagonal B on one side on the first rung and on the 4th
rung on the other side. (See fig.2) Make sure that the butterfly
locking part is completely rotated to hold the diagonal firmly in
position.
5.3.
Place horizontal brace C on the first rung and lock in position.
(See fig.3)
5.4.
Attach a diagonal B onto the lower rung of one of the two-rung
guardrail end frames D. (See fig.4) Position the first two-rung
guardrail end frames D (without the diagonal) on the base and
then put the two-rung guardrail end frames D already equipped
with the diagonal on the other side of the base.
(Ensure that the diagonal B is placed at an angle to the one
already on the base). (See fig.4) Ensure that the butterfly
locking part is completely rotated to hold the diagonal firmly in position.
Once end frames D are in position, put the 4 locking pins in place and attach the base of diagonal B on to the 5th rung of the base
frame A. (See fig.5)
Place platform H on the 6th rung from the bottom. Lock the wind lock firmly into position. (See fig.6).
© Jack Sealey Limited
Description
Quantity
Original Language Version
1
2
5
2
1
SSCL1.V2, SSCL3, SSCL4 | Issue:3 (3) 12/11/19

Advertisement

loading

This manual is also suitable for:

Sscl3Sscl4Sscl1.v25024209628440