Download Print this page

Sealey MCS01 Instructions page 2

Vehicle storage shelter(2.7 x 1.050 x 1.550 mtrs)

Advertisement

4.2.
ASSEMBLY
4.2.1.
The Storage Shelter comes partially assembled with
side arms (fig1.A and fig1.B) pre-built.
4.2.2.
Arrange items fig1.A and fig1.B such that A is to your right and
B on your left with the shortest tubes of the arms is
pointing away from you (fig2).
fig.2
4.2.3.
Connect the two vertical support tubes (fig1.E) to side
arm arrangements (fig1.A, fig1.B) using fixings fig1.F,
fig1.G and fig1.H as shown in fig3.
fig.3
4.2.4.
Connect end brace (fig1.D) to side frames (fig3.A, fig3.B).Connect all top bars (fig1.C) across the side frames. Leave last C bar
unconnected at this stage (see fig4.)
4.2.5.
Fix locking bars (fig4.J) to hinge point using supplied fixings (positions fig4.A, fig4.B). Disconnect the lower most tubes and slide
locking rings (fig1.K), fig5) onto tube. Reconnect tube to central hub (fig5). Slide locking collar (fig4.K) over open ended tubes and run
down to hinge point. To lock frame, slide locking collar (fig4.K) over locking bar (fig5).
© Jack Sealey Limited
fig.1
fig.4
fig.5
Original Language Version
MCS01
Issue 2 11/03/19

Advertisement

loading