Download Print this page

Lenovo ThinkSystem SR650 Quick Start Manual page 11

-48 v dc
Hide thumbs Also See for ThinkSystem SR650:

Advertisement

Before installing a hot-swap power supply, touch the static-protective package that contains the new hot-
swap power supply to any unpainted surface on the outside of the server. Then, take the new hot-swap
power supply out of the package and place it on a static-protective surface.
To install a hot-swap power supply, complete the following steps:
Watch the procedure. A video of the installation process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-A25P7vBoGa_wn7D7XTgDS_
• Youku:
http://list.youku.com/albumlist/show/id_50483444
Step 1.
If the server is in a rack, adjust the cable management arm (CMA) to gain access to the power
supply bay.
If you have installed the 2U CMA Upgrade Kit for Toolless Slide Rail or Toolless Slide Rail Kit with
2U CMA, do the following:
Figure 7. CMA adjustment
a. Press down the stop bracket
b. Rotate the CMA out of the way to gain access to the power supply bay.
1
and rotate it to the open position.
1 1 1 1

Advertisement

loading

This manual is also suitable for:

Thinksystem sr630Thinksystem sr550