Hitachi airCloud HC-IOTGW Installation & Maintenance Manual page 17

Air conditioner management system
Table of Contents

Advertisement

Available languages

Available languages

(5) Follow the instruction below to perform power wiring work.
Type of Wiring
Power Input
Wiring Length
Cable Specification
Terminals/Connector
Connection Procedure
Type of Wiring
Specification
Wiring Length
Cable Specification
Terminals/Connector
Connection Procedure
NOTE:
● The distance between the power line and communication line is more than 150mm.
Table 3.2 Connecting Wires
Line pressing board
Terminal
Cable
1. Let wire out of the power line outlet.
2. Insert wire into round terminal.
3. Crimp the round terminal to fix wire.
4. Fix each round terminal to terminals with screw.
5. Fix cable with line pressing board.
H-LINK (Communication Line)
5VDC
Less than 1,000m (3,281ft.)
2
AWG21 (0.75mm
) to AWG16 (1.25mm
M2.5 Screw Terminal
Non-polar
Screw Tightening Torque:
0.4N·m
▪ Crimp the round terminal to connect wire.
▪ Let wire out of H-LINK line outlet.
▪ Fix each round terminal to terminals with screw.
Power Line
AC 100~240V 50/60Hz
-
2
AWG15(1.5mm
) to AWG12(2mm
Outer diameter finish is up to 10mm
M3 Screw Terminal
Screw Tightening Torque: 0.5 N·m
Screw Tightening Torque: 0.25 N·m
Cable
Crimping Pliers
2
)
▪ Let wire out of LAN wire outlet.
▪ Insert connector until lock sound is heard.
15
2
)
Φ6-Φ8.5mm
Terminal
LAN Cable
IEEE802.3 Compliant
100BASE-TX/10BASE-T
Less than 100m (328.1ft.)
LAN Cable (CAT 5 or more)
RJ45 Connector

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents