Download Print this page

Sealey CP50MC Instructions page 2

Lithium-ion 18v mains charger lithium-ion 18v battery

Advertisement

2. INTRODuCTION & SPECIFICATIONS
Mains Charger - Recharges Sealey 18V Lithium-ion battery (model
No. CP50BP) in 1 hour. LEDs indicate when charging and when
charging is complete. Intelligent charging process maximizes battery
life.
Input Supply: ................................................................. 230V AC 50hz
Battery Type: ............................................................... 18V DC - 2.6Ah
Weight: ......................................................................................0.46 kg
Battery model No (not included): ...........................................CP50BP
Battery - Li-ion batteries give an all-round better performance than
standard Ni-Cd/Ni-mH cells. They maintain a high energy density
level with a flat discharge curve - performing better and longer than a
conventional Ni-CD/Ni-mH battery. No memory effect allows the
battery to recover from a deep discharge with no tendency to reduce
overall capacity. Features integral battery level indicator. Requires 1
hour mains charger (sold separately, order model No. CP50mC).
Suitable for use with Sealey 18V Lithium-ion range.
Battery Type: ............................................................... 18V DC - 2.6Ah
Weight: ......................................................................................0.66 kg
Charger model No (not included): .........................................CP50mC
3. CHARGING
CHARGING THE BATTERY
Note: When new, the battery will have been shipped in a low charge
state. Fully charge the battery before using your tool
3.1
To remove the battery from the tool, depress the two side
clips on the battery. DO NOT touch the metal battery terminals.
3.2
Take the base charger (model No:CP50mC) and plug it into the
mains.
3.3
The battery is designed to fit into the charger one way
only. This is to ensure that the positive (+) and negative (-)
polarities correspond. Insert the battery and press lightly to
seat the battery firmly into the charging base, as in fig.1.
WARNING! DO NOT try to force battery into the base the
wrong way around.
3.4
When the charger is plugged into the mains the Green led will
illuminate.
3.5
When the battery is inserted into the charger the red LED
(fig.1) will begin to flash, this indicates the battery is charging.
3.6
When the red LED (fig.1) stops flashing and is solid the
battery is fully charged.
3.7
If when inserting the battery the red LED (fig.1) does not
illuminate the battery is already fully charged.
3.8
Switch off and remove the plug from the mains. Remove the
battery from the charger. Insert the battery back into the tool
(fig.2) until it snaps into place. The tool is now ready for use.
3.9
To check charge state of battery depress button on top of the
battery pack, the lights will illuminate to indicate how
much charge is left in the battery.
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to a recycle centre
and disposed of in a manner which is compatible with the environment.
When the product is no longer required, it must be disposed of in an environmentally protective way.
Battery Removal - Unclip the battery from the tool and dispose of according to local authority guidelines. Rechargeable battery contains Lithium-ion
(Li-ion). It is recyclable. Take to your local recycling centre to be disposed of properly.
Li
Under the Waste Batteries and Accumulators Regulations 2009, Jack Sealey Ltd are required to inform potential purchasers of products containing
batteries (as defined within these regulations), that they are registered with Valpak's registered compliance scheme.
Jack Sealey Ltd's Batteries Producer Registration Number (BPRN) is BPRN00705
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
IMPORTANT: No liability is accepted for incorrect use of this product.
WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
INFORMATION: For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
Environmental Protection
Sole uK Distributor, Sealey Group,
Kempson Way, Suffolk Business Park,
Bury St. Edmunds, Suffolk,
IP32 7AR
Original Language Version
www.sealey.co.uk
01284 757500
Web
sales@sealey.co.uk
01284 703534
email
CP50mC, CP50BP
fig.1
Issue: 1 - 17/05/10

Advertisement

loading

This manual is also suitable for:

Cp50bp5051747509979